Friday, 9 February 2018

Tramway at the Warren

I went up to the Warren this morning to have a look at the new path that's been laid over the top of the old tramway - and it's not as bad as I thought it might be. It seems that some stones from the tramway have been displaced, but most of the spoil on either side of the new path is soil, not stone, and it looks as if most of the tramway bed is still in place.


I walked the whole length of it, and the new surface certainly makes it easier to get along the path beside the house, which had quite a few tree roots across it. They've also renewed wooden edgings on the main Bailey Walk, which should make it good for a few years more.

No comments: